Property is planted to alfalfa and cotton. Property has one (1) 260′ foot well that was drilled in 2021 with a 75HP pump. There is one (1) 50HP pump and well. The property also has three (3) 7.5HP lift pumps. There is also one (1) domestic well. County of Merced GSA - Delta-Mendota Excellent Soils The Los Banos General Plan designates the property as Agricultural/Rural and SR-152 Bypass Corridor. There is a +/-1,000 sq. ft. office building on the property. The current lease is through December 31, 2025. The Sustainable Groundwater Management Act (SGMA) requires groundwater basins to be sustainable by 2040. SGMA requires a Groundwater Sustainability Plan (GSP) by 2020. Said plans may limit ground water pumping. For more information please visit the SGMA web site at www.sgma.water.ca.gov/portal/